The Challenge

To begin this project, it was necessary to conduct an asbestos test, as there was a high likelihood of its presence given that the house was built in 1890. Asbestos testing often takes considerable time, depending on how the laboratory handles the analysis. To address this concern, we sent a sample of the wall scheduled for removal to be analyzed. Although this required pausing the work for a couple of weeks, the test results fortunately confirmed that no asbestos was present.

The Solution

With this assurance, we successfully proceeded with the plan, removing the wall to expand the bathroom and transform it into a larger, open-concept space. This allowed more features to be added to the project, from the inset shelf to a full walk-in shower. Other elements were added using the additional space, such as a sitting bench and glass front panel/door. These added features made the shower the featured element in the complete bathroom makeover project. 

 

Results

The Results Were Dramatic

We were very impressed with how well this project went. We absolutely recommend this company to others!

Project Owner

Gallery

A Visual Glimpse Of The Project

Our Values Make A Difference

N

Integrity is our number one value

N

Fully transparent bids and quotes

N

Attention on jobsite from owner

N

Our contract is a relationship

Work With Us

We Are Ready To Start Your Project

Call Toll Free

(404) 573-0327

Contact Us Now